The Symbiosis of Lean Construction, BIM and integrated project management in the construction industry

by Dr. Lisa Lenz & Alexandra Nestorowicz | July 24th, 2025

The demands placed on construction projects are constantly increasing as the industry continues to develop dynamically. Adherence to deadlines, cost certainty, transparency and sustainability are becoming increasingly important, while the complexity of projects continues to grow. In order to meet these challenges, integrated approaches are needed that take technological, organizational and methodological levels into account in equal measure. The combination of lean construction, building information modeling (BIM) and integrated project execution (IPA) provides a powerful basis for this. Their coordinated application enables a collaborative, transparent and efficient design of the entire project process. This article shows how these methods interact, what advantages they offer and under what conditions their potential can be used sustainably.

Integrated project management as a system change for more cooperation and goal orientation

Modell, schwarz-weiß, Bauindustrie, Baustelle, Krahn, 3D

Integrated project management has been a proven international model for the implementation of complex construction projects for over two decades. In Germany, it has been used in initial pilot projects since 2018. The key aspect here is the change in perspective: the focus is no longer on the delimitation of individual services, but on the joint responsibility of all parties involved for the success of the project. A central component is the multi-party contract, which combines planning and execution and jointly distributes both risks and opportunities. This forms the basis for a consistently collaborative project culture.

The aim is to create framework conditions that make the achievement of ambitious project goals more likely than with conventional models. Early involvement of key players should help to identify potential, promote innovation and manage risks with foresight. Communication and organizational structures are set up in such a way that a common understanding of objectives is created and individual interests take a back seat. Trust, transparency and continuous learning are just as important as clear rules for decisions and remuneration.

A construction project is considered a genuine IPA project if eight key characteristics are fulfilled, which are broken down into 21 specific components. These include the multi-party agreement, systematic risk management and a jointly supported set of values. Only if all these elements are implemented can IPA achieve its full effect and contribute to higher quality, efficiency and better adherence to deadlines and regulations.

BIM as a digital platform for transparency and collaboration

3D-Modell, Bauindustrie, Hochbau

Building Information Modeling is much more than a three-dimensional model of the building. It is a method for generating, managing and using digital building information across the entire life cycle. The building model is not only mapped geometrically, but also expanded to include functional, temporal and economic data. This creates a digital twin that serves as a common information and communication basis for all project participants.

A central element is the merging of the individual specialist models into an overall model. This form of cooperative model creation requires new forms of collaboration that focus on transparency, responsibility and coordination. At the same time, BIM has an impact on internal processes and may require new roles within the company. Clear objectives and defined use cases are therefore essential, whether for optimizing planning processes, supporting public relations or managing deadlines and costs.

In practice, BIM allows the integration of additional dimensions. In addition to the three-dimensional geometry, time sequences and cost information can also be integrated. This allows construction processes to be simulated, schedules to be checked and construction costs to be calculated precisely. Elements such as drywall can not only be displayed, but also linked to properties such as sound insulation or suitability for damp rooms. The information content is thus precisely recorded at component level.

In addition to technical modelling, organizational implementation is crucial. Clear specifications on the data structure, responsibilities and times of data creation are necessary in order to use the model as a reliable basis for decision-making. If BIM is combined with legal and economic framework conditions, for example through a multi-party contract, comprehensive control based on consistent data can be realized.

Lean construction with a focus on continuous improvement and process quality

Digitization, Modell, Process-Management, Automization

Lean construction is not a single method, but a comprehensive approach. The aim is to continuously improve all processes during the course of the project, avoid waste and align all activities with actual customer benefits. In contrast to traditional management models, work is not planned in advance but is demand-oriented. Processes start when they are really necessary. This increases efficiency and flexibility and reduces errors.

A central tool of this approach is the Last Planner System. It enables structured planning and control of construction work. All project participants, from planners to the trades carrying out the work, are involved at an early stage. The project is continuously refined in several stages, from the analysis of the overall process to milestone planning and specific weekly planning. Disruptions are not only recorded, but also systematically analyzed and rectified through targeted measures. This creates a continuous learning process.

The positive effects are clearly evident in practice. Greater planning reliability, fewer unplanned interventions, better coordination between the trades and a much more relaxed construction site atmosphere are frequently cited results. The close cooperation creates a common understanding of the project goals. Supplemented by an open error culture based on the Kaizen principle, an environment is created that promotes innovation and quality in equal measure.

The symbiosis of IPA, BIM and Lean as an integrated approach to success

3D Darstellung, Gebäude, Hochbau, Grafik, schwarz-weiß

The real strength of these three methods lies in their combination. IPA creates the contractual and organizational basis for cooperative project management. BIM provides the technological infrastructure to enable transparency and consistent data flows. Finally, lean provides the methodological tool for designing efficient, learning-oriented and user-centered processes.

In such an integrated model, the individual elements interlock. The digital building model makes it possible to identify sources of error at an early stage, optimize processes and make well-founded decisions. Lean ensures that the available data is also translated into practicable process improvements. IPA, in turn, ensures that everyone involved shares responsibility and that risks and goals are shared.

This connection leads to a significant increase in quality and efficiency. At the same time, it creates a solid foundation for sustainability and innovation. Circular economy approaches can be better implemented through structured data storage in BIM models. New technologies such as 3D printing or modular construction methods can be integrated in a more targeted manner. This also paves the way for the use of artificial intelligence and automated analyses.

The key to implementing integrative construction projects

Digitization, Screen, 3D-Modell, IPA, BIM, Lean

In order for IPA, BIM and lean to develop their full potential, certain conditions must be met. The right organizational, technical, legal and cultural framework conditions are crucial. After all, methods alone have little effect if structures, people and processes are not aligned with them.

From an organizational point of view, a three-stage project setup has proven its worth. It comprises a senior management team, a project management team and a project implementation team. This structure ensures clear responsibilities, swift decisions and smooth coordination, especially when introducing new methods and digital tools.

At a technical level, consistent, quality-assured data models are essential. This requires suitable platforms, structured data formats and coordinated interfaces. The handling of data security, access rights and versioning must also be clarified so that all parties involved can work together efficiently.

In legal terms, the multi-party agreement is a central element. It not only defines roles, objectives and services, but also regulates the handling of risks and conflicts. The introduction of such a contract requires trust, legal expertise and a common understanding of objectives. If this is implemented consistently, a reliable framework for working in partnership is created.

Cultural change is particularly crucial. The introduction of integrative methods means questioning old ways of thinking and allowing new forms of cooperation. Openness, a sense of responsibility and a willingness to learn are key success factors. To promote this, targeted training, participative change processes and transparent communication of the benefits are required.

The IPA digital research project provides an illustrative example. An interdisciplinary team is developing digital tools and methods for integrated project management. The project shows that technological, organizational and cultural requirements need to be considered and implemented together in order for real transformation to succeed.

Conclusion

The combination of integrated project management, building information modeling and lean construction offers enormous potential for the construction industry. It not only increases the quality and efficiency of projects, but also fundamentally changes how construction projects are planned, managed and implemented. Those who do not view these three concepts in isolation, but as an integrated system, lay the foundation for future-proof, resilient and sustainable construction projects.

The path to a digitalized, collaborative construction industry is not a destination, but a continuous process. With the right attitude, the right tools and a clear common focus, even complex challenges can be successfully overcome.

If you would like to find out more about how your project can benefit from the integration of these approaches, we invite you to visit our project page. There you will find further information on current projects and the IPA digital research project.

Navigation

360°BAUdigital zum Nachlesen!

Noch ein Schritt zum Download

Wie lassen sich Bauprojekte effizienter, nachhaltiger und digitaler gestalten?
Wir liefern praxisnahe Ansätze und Tools für Planung, Bau und Betrieb.

Navigation